References

in drying

Connecting Pipeline Gazelle (Czech Republic)

Data of the pipeline: DN 1400; 103,000 m
Scope of work: Drying of the pipeline down to -20°C

MEGAL SDW Loop, Schwandorf - Windberg (Germany)

Data of the pipeline: DN 1000; 70,000 m
Scope of work: Drying of the pipeline down to -25°C

NEL Lot 3/4/5 (Germany)

Data of the pipeline: DN 1400; 90,000 m
Scope of work: Drying of the pipeline down to -25°C

TENP, Hügelheim - Schwarzach (Germany)

Data of the pipeline: DN 900; 115,000 m
Scope of work: Drying of the pipeline down to -25°C