This time 4 colleagues have been in the South West of France. First of all a pressure test has been carried out at the pipeline located at the foot of the Pyrenees. After that, we worked with one of our caliper pigs in order to exclude possible bumps or ovalities. At the end, the pipeline having a total length of 9 km has been dried.